Measurement of concrete will be made only to the
neat lines of the structures.
as shown on the
drawings or as established by the Engineer. Any
thickness of concrete shown on the drawings may
be changed by order of the Engineer, in which
case, the changed thickness will be the basis of
measurement for payment.
Image via Wikipedia
In measuring concrete for payment, the volume of
all individual boreholes, recesses, openings and
metalwork, greater than 0.04 cubic meter in
volume, will be deducted. No allowance will be
made for reinforcement bars, anchor bolts, water
stops, etc. and pipes 5mm and less in diameter.