Measurement of concrete will be made only to the

neat lines of the structures.

   as shown on the

       drawings or as established by the Engineer. Any

       thickness of concrete shown on the drawings may

       be changed by order of the Engineer, in which

       case, the changed thickness will be the basis of

       measurement for payment.

Image via Wikipedia

       In measuring concrete for payment, the volume of

       all individual boreholes, recesses, openings and

       metalwork, greater than 0.04 cubic meter in

       volume, will be deducted.  No allowance will be

       made for reinforcement bars, anchor bolts, water

       stops, etc. and pipes 5mm and less in diameter.

1
Liked it
Comments (0)

Currently there are no comments related to "Measurement AND Payment of Concrete". You have a special honor to be the first commenter. Thanks!

Leave a Comment

Hi there!

Hello! Welcome to Authspot, the spot for creative writing.
Read some stories and poems, and be sure to subscribe to our feed!

Find the Spot

Loading